Installation of a portable clinching machine
The booster and the balancer should be installed on a combined running cradle to avoid collisions, while maintaining the suspension cable of the work head perfectly vertical over the whole work zone.
The air supply must be dry, filtered and regulated, with a minimum size of ½“ for ensuring the shortest possible cycle time.
All the SPOT CLINCH® systems are designed for operation without lubricator on the air preparation unit.
